1.1. Natural and geographical conditions

The region - 1.25 thousand. Km2
The administrative center – Dolyna city
The distance to the city. Ivano-Frankivsk - 58 km
Natural resources
Dolinsky district is rich in mineral resources, including oil and gas, underground fresh and mineral waters, brines, as well as raw materials for construction materials.
The basis of mineral resources extracted in the area of oil and gas up. The main deposits are in late, the final stage of development, characterized by a gradual decrease in mining production. Initial recoverable reserves of deposits amounted to 57.0 mln. Tons of oil, according to estimates remain about 8 mln. Tons.
The area also found more than 10 displays of various types of mineral water. Among the most common water without specific components and properties, sodium chloride brine water of the "NAFTUSYA" - found 6 water destination. The most famous is Novo Mizunske field, whose waters used for therapeutic purposes, and also for industrial bottling called "Goryanka."
In the natural resource potential of one of the main places are also forest resources. The total area of forest in the district is 92.8 thousand. Ha, which is about 75.0 percent. Square area.
Hydrography area forms a group Dniester River basin: Candle, planted, Luzhanka al., Whose highly branched tops begin on the northern slopes of the Carpathian Mountains, at an altitude of over 1,000 meters above sea level. Candle largest river length 107 km originates from Gorgan Vyshkovo ridge at an altitude of 1155 meters. Great natural lakes in the area do not. One of the biggest is Dolyns'ke lake, which covers an area of 25 hectares. The average reservoir depth of 2.5 m.
1.2. Demography
The population of the region - 69.8 thousand people
(On 01/01/2016)
1.3. Economic potential
Industry
The industrial potential of the area consists of 9 major industry employing 3,325 people and annual industrial output of about 2500.0 mln. UAH.
The main branch of industry serving oil and gas industry - a very important element that largely determines its socio-economic and cultural status, improves the livelihoods of local people.
Analysis of the oil production in the area also points to poor dynamics of hydrocarbon production. Thus, since 1990, the volume of oil OGPD "Dolynanaftogas" dropped by half, and for January-December 2015 on OGPD "Dolynanaftogas" oil production (including gas condensate) fell to the corresponding period of the previous year by 9.0 percent., And gas - by 1.0 percent.
Leading industry that generates nearly half of industrial output processing industry is the production of wood and wood products.
This industry is one of the first and reached stabilization in recent years increasing its commodity products. The development of the wood industry the area is in the direction of processing wood for timber production and wood-fiber plates.
Ltd. "Uniplyt" is the only enterprise in Ukraine producing wood-fiber board wet and a major supplier of these products both in Ukraine and abroad. Annual output plate reached almost 18.0 million square meters.
Investment program LLC "Milvud" in 2015, provided to commission two dryers and complete construction of the plant manufacturing laminated, fused timber KVH and BSH.
The main strategic direction of manufacture of wood and products of it is to create a modern high-tech production of deeper wood for the economy and the domestic and foreign markets in forest products, competitive products on wooden base.
Light Industry Enterprises Ltd. "Trust" and LLC "Working" have great potential in production of garments. The output toll basis under contracts with foreign customers makes it possible to maintain production and human resources businesses, create new jobs and to master advanced technological processes.
Sales volume data of enterprises in January-December 2015 compared to the year 2014 grew by 25.0 percent.
In 2007 began construction of a new garment factory LLC "Hroklin-Valley" Tailoring upper seats for cars financed by Polish investors.
Prospects for the expansion of production is high quality goods for their sale on the domestic and foreign markets.
Agriculture
The main owners and land users are households. At the end of 2015, they focused 18,9 hectares of agricultural land, including 11.6 hectares of arable land.
In 2015, there were 14 in the vicinity of existing businesses (including farms), whose principal activity is agriculture.
The structure of agricultural production in the area dominated by crop production.
Investment and foreign trade activities
In the area of economic development in January-September 2015 the district entities invested 111.1 mln. capital investment, which is 2.4 percent. the total volume in the region. In per capita mastered 1589.1 UAH. investment.
As of 1 October 2015 Dolinsky district's economy by foreign investors from 11 countries invested 10.0 mln. USD. US foreign direct investment (equity), of which in January-September 2015 15.0 thousand. Dollars. USA. Priority investment in the economy area belongs to the European Union, which provided 95% of investments are the main residents are neighboring Poland. The most attractive to foreign investors, processing industry, which is concentrated 96.5% of foreign capital. The rate of growth (reduction) of direct foreign investments, percent to volumes to the beginning of the year Dolinsky district took 2nd place in the area.
Among the striking examples of the effective use of foreign capital in the region is the construction of garment factory Polish joint stock company "Inter Hroklin Auto JSC". Currently now announced a set of employees for learning and future work.
Exports of goods of foreign economic activity Dolinsky district in 2015 amounted to 20.2 million. US imports - 5.8 million. USA. Compared with the previous year, exports declined by 21.8 per cent., Imports - by almost 30 per cent ..
The share of area in total regional exports of goods amounted to 5.4 per cent., Imports - 2 percent ..
The partners in foreign trade were residents of 39 countries.
Over 80% of exports of goods was sent to Romania, Germany, Hungary, Poland, Czech Republic and Slovakia. The basis of export shipments accounted for wood and wood products and textiles.
More than half of imports received from Germany. Substantial amounts of goods were received from Poland, Czech Republic and China. From outside the country came to the area of textiles and textile products, chemicals and related industries, mechanical and electrical machinery, base metals and products, footwear and its parts, transport means, except rail.
The largest enterprises
Name of Company |
Activity |
NDVU "Dolynanaftogas" |
Mining and quarrying development |
LTD "Sewing Factory" Dovira" |
Textile production, clothing, leather, leather and other materials |
LTD "Specodyaq" |
Textile production, clothing, leather, leather and other materials |
LTD "Interior" |
Production of wood products, paper, printing |
LTD "Uniplyt" |
Production of wood products, paper, printing |
Dolinsky gas processing plant |
Coke and refined petroleum products |
LTD " Zhyvytsya Plus" |
Manufacture of chemicals and chemical products |
Products produced in the area
1. Oil oil including condensate
2. Natural gas and passing
3. Korbomidni resin
4. wood-fiber plates
5. liquefied gas
6. Ready-made garments
1.4. Transport and communications
The transport system of the area represented by rail and road modes.
Dolinsky district is located at the intersection of two roads of national importance:
· Н-10 «Stryy – Ivano-Frankivsʹk – Chernivtsi – Mamalyha»
· Р-21 «Dolyna – Khust»
This Dolyna of existing direct and easy access to the regional centers of western Ukraine city of Lviv, Ivano-Frankivsk and Chernivtsi, one of two road corridors in Transcarpathia, as well as access to the E40 international highway near the town of Stry (Lviv region.).
The region is a branch of the Lviv railway station "Valley". Operates a modern rail and road stations.
Nearest railway station:
• Stry (Lviv region.) - 38 km;
• Ivano-Frankivsk - 60 km;
• Lviv - 114 km.
Nearest airports:
• International Airport "Ivano-Frankivsk" - 60 km;
• International airport "Lviv" - 114 km.
1.5. Education
In 2015, in the area there are 62 educational institutions. Among them, 4 secondary schools of a new type: Dolinsky gymnasium №1, specialized boarding school, natural and mathematical lyceum, specialized school №6, 16 secondary schools of I-III, 9 secondary schools and II degrees, 6 degrees and secondary schools 10 educational complexes "general education - pre-school", 10 pre-schools, 3 extracurricular institutions (House of children and Youth, young technicians, children and youth sport school), inter-school educational-industrial complex, night school II-III. There are two schools of regional submission, profitable educational correctional and rehabilitation center, Dolinsky mixed type children's home for orphans and children left without parental care and pre-school age.
In the 2015-2016 academic year in secondary schools enrolled 7,910 students in 472 classes. Works 25 day groups of occupancy of 746 students. 1495 children brought up in pre-schools.
1.6. Socio-cultural sphere
Health
District medical care provided by 45 medical institutions. This includes: Central District Hospital, Children and profitable urban hospital, dental clinic, TB dispensary, 8 (eight) rural medical clinics and 32 family-style medical points.
Culture
Near the network of cultural institutions is 90, of which 44 - clubs, centralized library system - 43 institutions -muzychni 2 1 - Children's art school.
1.7. Tourism
The district is located 18 operating facilities of tourist and recreational areas that can simultaneously accept 860 people. There are 15 green tourism estates with 200 seats. Three estates assigned baseline and one assigned Manor 3 category.
In order to create an enabling environment, adequate infrastructure and new tourist routes for the development of promising thematic areas of tourism, including adventure, cultural, educational, sports and recreation, and for the purpose of increasing the flow of tourists to the area organized the annual festival.
Places of interest area is Hoshivskyy Monastery of St. Basilian fathers, tourist route narrow gauge railways "Carpathian tram" Heritage Center Vygodskii narrow, Dolinsky museum "Boikovshchina" Tatiana and Omelian Antonovich, Museum Kryjivka and tourist route to Mount Yavoryna - to the bunker edge leader of OUN - UPA Robert.
SECTION 2. PROPOSAL FOR INVESTORS
2.2. Investment projects
Information about investment project |
Full name of investment project |
"The development of the industrial park" Dolyna " in Dolyna Ivano - Frankivsk region" |
Prerequisites, that contribute to the project implementation |
- The plot of land is located at a certain distance from the housing estate, within the town. It is the area with extremely attractive mountain views;
- There are all the basic utilities (gas, electricity, water delivery and sewerage );
- The relief of the area is clean and flat. The area is not waterlogged.;
- The land plot has a single owner (the territorial community the town of Dolyna) and is free of obligations;
- ; The plot of land has never been used for industrial or military facilities needs.
- Convenient transport сonnection (entrance road and railway), location at the crossroads of the main ways between Lviv, Ivano-Frankivsk and Transcarpathian Regions;
- Not far from the borders of the states of the European Union;
- The moderate and attractive value of the normative monetary valuation of land for investors;
- The desire of local authorities to cooperate with investors. |
Expected results after project implementation |
- Creating favorable conditions for the deployment of new enterprises, including foreign.
- Intensification the process of attracting foreign and domestic investment in the economy.
- An increase of receipt of taxes, collections (obligatory payments) in a budget.
- Realization of the technical re-equipping, ensuring the increase of production of competitive goods.
- Ensuring the effective use of the existing enterprises.
- Increase of the regional growth rates of industrial production.
- The increase employed persons number and as a result, the improvement of social standards and economic situation in the district and in the region.
- Thе increase of salary, of level and life quality of population;
- Minimization of negative influence of crisis of the traditional industry types, which are typical for a region (especially oil and gas) and her consequences on an economy and social region sphere . |
UAH to USD exchange rate as at the date of information preparation |
25,0 |
Total cost of project
(thousand USD) |
235 |
Amount of investor's contribution (thousand USD) |
209 |
Required type of investor's contribution |
Money for the project-searching works, making project-estimated documents, the construction of inner road and the branch of the entering railway on the territory of the industrial park. Costs- 209 000 USD. |
Contribution of the initiator of the project |
Costs—26000 USD.
The land plot- 27 ha.
|
Stage of the project |
The idea of the project (the investment offer).
A feasability study is prepared (the concept of industrial park
Realization has been started (construction of entrance road, basic utilities, erecting of the branch railway line has been projected) |
Manner (form) of investment attraction |
The creating of joint venture with the investor.
The agreement of joint action |
Describe the process of cooperation with investor (in particular, what payment guaranties can be provided to investor ) |
The transfer of plots to investors , who intends to build the industrial objects within the new industrial zone will be based on the auction for the right to purchase or long lease.
The Value of normative money estimation is used to determine the base cost of land. |
Expected payback period of project |
The average return on investment is 6-7 years, depending on the type of production and subject minimizing "time to market" for investors. |
Is it necessary to apply to the body of local government for acquisition of rights on the land plot |
Yes |
If it is necessary, what stage is the process of land plot allocation on |
At the stage of full readiness |
Possible project risks |
Unstable political and economic situation in the country, the military conflict in Eastern Ukraine, it could negatively influence on investor attraction. |
Other important information about the project |
The aim of this project is an increase of competitiveness of land plot of industrial park "Dolyna" for creating conditions to attract investment for the construction of new industrial capacities by developing basic physical infrastructure of land and its wider promotion in interested circles.
Closeness of industrial park territory to the basic logistic streams and borders with the states of the EU, placing on crossing of state value roads of R-21 Dolyna-Khust and N-10 Stryi- Chernivtsi -Mamalyga, presence of a single owner (community property), openness and transparency of local-authority and the desire to cooperate with investor are basic advantages |
Information about the entity-initiator of project |
Full name, EDRPOU |
Dolyna Council |
Location, address |
Nezalezhnosti Street,5
Town Dolyna, Ivano-Frankivsk region,
Ukraine 77500
Phone : (03477) 2-70-30
Fax: (03477) 2-70-35
E-mail: rada@dolyna.info |
Form of owner ship |
community |
Core activities |
Dolyna city council is the body ,that represents the territorialccommunity the town of Dolyna and brings to effect the functions of local self-government, it’s determined by the Constitution and Laws of Ukraine; inculcates socio-economic and cultural politics of town.
Dolyna town council follows by the Constitution of Ukraine, Laws of Ukraine "On the local government in Ukraine", "On the service in local government", other legal acts regulating the powers and functions of local government. |
Website |
http://rada.dolyna.info |
Contacts |
Name, surname of the contact person |
Volodymyr Smolii, Natalia Holovata |
Position |
The assistant of the mayor, the specialist of the investment, energy conservation and municipal development department |
Telephone:
- office phone
- mobile phone |
+38 (03477)2 70 07
+38 099 2206091 |
Е-mail |
v.smolii@dolyna.info ; n.holovata@dolyna.info |
Fax |
+38 (03477) 2-70-35 |
Language of communication |
Ukrainian, English |
Date of preparation |
06/2016 |
Information about investment project |
Full name of investment project |
"Creation of conditions for the development of balneological tourism in Dolyna" |
Prerequisites, that contribute to the project implementation |
In order Dolyna City Council of Odessa Research Institute conducted 2 stages SPA primary research salt brine. Based on the data available today can be said about the uniqueness of this mineral resource on which to build possible Therapeutic infrastructure |
Expected results after project implementation |
Use of natural resources (salt brine) will be renewed and the conditions for the development of balneological tourism in Dolyna will be created: the demonstration model of the balneological complex will be made, investors' attention will be drawn, land lots will be transferred, new complexes will be built, tourist flows will be formed and, as a result, input cash flows in all city economic sectors, including budget revenues, will be considerably increased |
UAH to USD exchange rate as at the date of information preparation |
24,8 |
Total cost of project
(thousand USD) |
157,3 |
Amount of investor's contribution (thousand USD) |
141,3 |
Required type of investor's contribution |
Funds for preparation, designing, building and putting into operation the municipal shop floor of salt products; preparation, designing, building, putting into operation and successful functioning of the demonstration model of the balneological complex under communal ownership |
Contribution of the initiator of the project |
Funds – 16K USD
Land lot – 10 ha |
Stage of the project |
Project idea (placement memorandum). Feasibility study is prepared (Conception of the investment zone development accepted by the Dolyna City Council) Beginning of realization (Physicochemical and preclinical analyses of healing salt brine properties are available. The final clinical research stage is underway) |
Manner (form) of investment attraction |
Creation of the joint venture company with the investor Joint venture agreement |
Describe the process of cooperation with investor (in particular, what payment guaranties can be provided to investor) |
Transference of land lots to investors that have intention to build sanatorium-and-spa institutions and service objects may take place as the result of right of redemption or tenant right auction. Use of waters from the pool "Barbara" is possible only on conditions of issuance of a proper license. Participation of the investor and cooperation with local authorities is also possible in the form of the creation of common law subjects. |
Expected payback period of project |
Taking into consideration the substantial healing potential of salt brines of Dolyna, on condition that marketing policy will be built in the right way, payback period may range from 6 to 8 years |
Is it necessary to apply to the body of local government for acquisition of rights on the land plot |
Yes |
If it is necessary, what stage is the process of land plot allocation on |
At the full readiness stage |
Possible project risks |
Volatile political and economic situation in the country, military conflict in the east of Ukraine that can negatively affect investor attraction. |
Other important information for investor about the project |
This investment project suggests the building of hypaethral swimming pools complex together with the leisure and hotel infrastructure on the territory of land lots of the old brine pit and a military town in the old part of Dolyna, and also the restoration of historical buildings of the brine pit and the creation of the unique salt making museum. |
Information about the legal entity -initiatorof the project |
Full name, EDRPOU |
Dolyna City Council |
Location, address |
5, Prosp. Nezalezhnosti Dolyna, Ivano-Frankivs'ka obl. Ukraine 77500 Phone: (03477) 2-70-30 Fax: (03477) 2-70-35 E-mail: rada@dolyna.info |
Form of ownership |
State ownership |
Coreactivities |
The Dolyna City Council is the body that represents the local urban community and in its name and on its behalf has functions and powers of the local government determined by the Constitution and Laws of Ukraine. The Dolyna City Council is subject to the Constitution of Ukraine, Laws of Ukraine on Local Self-Governance in Ukraine, on Service in Local Government Body, other government regulations that spell out powers and functions of the local government. |
Website |
http://rada.dolyna.info |
Contacts |
Name, surname of the contact person |
Volodymyr Smolii, Natalia Holovata |
Position |
Deputy mayor; investment, energy conservation and municipal development specialist |
Telephone:
- office phone
- mobile phone |
+38(03477)2 70 07 |
Е-mail |
v.smolii@dolyna.info ; n.holovata@dolyna.info |
Fax |
+38(03477) 2-70-35 |
Language of communication |
Ukrainian, English |
Date of preparation |
August 2016 |
Information about investment project |
Full name of investment project |
Ski recreation complex "Beskyd" in the village Mislìvka Dolina district |
Prerequisites, that contribute to the project implementation |
The presence of the recreation complex "Beskid" in the village Mislìvka |
Expected results after project implementation |
Provides jobs during construction and 2,500 people 1,000 people during its operation; development of tourist recreation |
UAH to USD exchange rate as at the date of information preparation |
25,0 |
Total cost of project
(thousand USD) |
100 000,0 |
Amount of investor's contribution (thousand USD) |
300,0 |
Required type of investor's contribution |
Cash contributions, thousand USD |
Contribution of the initiator of the project |
Costs (thousand USD) – 100 000,0
Land plots (ha) - lease 480
Equipment – 35 000,0 thousand USD |
Stage of the project |
Project idea (investment proposal)
Feasibility study is elaborated (part) |
Manner (form) of investment attraction |
- Loan (guarantee of repayment - the value of existing real estate) |
Describe the process of cooperation with investor (in particular, what payment guaranties can be provided to investor) |
Concluding a long-term lease of land |
Expected payback period of project |
15 years |
Is it necessary to apply to the body of local government for acquisition of rights on the land plot |
No |
If it is necessary, what stage is the process of land plot allocation on |
Stage consent of State Enterprise "Vyhoda forestry", Ivano-Frankivsk Regional Forestry and Hunting Department of the Environment and Natural Resources Regional State Administration |
Possible project risks |
Distraction construction period due to bureaucratic coordination of project and other documentation in the field. |
Other important information for investor about the project |
The project "Ski recreation complex "Beskyd" is being implemented on the territory of the village Mislìvka of the Shevchenkove’s Village Council. According to the Decree of the Cabinet of Ministers of Ukraine of 28 December 1996 No. 1576 "On approval of the list of settlements, referred to the resort" the village Mislìvka is health resort. |
Information about the legal entity -initiatorof the project |
Full name, EDRPOU |
LLC "Investment Company "Ukrkapital", 32706734 |
Location, address |
Legal address: m. Kyiv,
st. Vasylkovska, 23 "B"
Location: c. Kyyia Str. Pugachev, 9
E-mail: sd_com@ukr.net |
Form of ownership |
Private |
Coreactivities |
Investments and construction |
Website |
- |
Contacts |
Name, surname of the contact person |
Svetlana Osmolovsky |
Position |
Director recreation complex "Beskyd" |
Telephone:
- office phone
- mobile phone |
+38(03477)91226
+380675052464 |
Е-mail |
svetla_osm@mail.ru |
Fax |
+38(03477)91226 |
Language of communication |
Ukrainian |
Date of preparation |
08.2016 |
Information about investment project |
Full name of investment project |
«Tourism rest point and public-social centre «Torun Pass» |
Prerequisites, that contribute to the project implementation |
Torun pass is a permanent place of short-term and leisure travelers.The State Enterprise "Vyhoda Forestry" organizes the territory. This enterprise was built wooden gazebos, tables with benches and information signs;cleaning and coming-out of rubish is performed also. Every day about 100 people stopped in Torun pass for the rest. |
Expected results after project implementation |
Better conditions for short leisure travelers, improving the quality of tourism services, facilitating access to information about the IvanoFrankivsk region |
UAH to USD exchange rate as at the date of information preparation |
24,8 |
Total cost of project
(thousand USD) |
1200,0 |
Amount of investor's contribution (thousand USD) |
1200,0 |
Required type of investor's contribution |
Cash contributions, thousand USD |
Contribution of the initiator of the project |
Plot of land (1.18 HA) - building Hospitality Center
Plots of land (0.72 HA) - resettlement World War І Memorial |
Stage of the project |
The idea of the project (the investment offer) |
Manner (form) of investment attraction |
Long-term lease of land |
Describe the process of cooperation with investor (in particular, what payment guaranties can be provided to investor) |
Concluding a long-term lease of land |
Expected payback period of project |
12 years |
Is it necessary to apply to the body of local government for acquisition of rights on the land plot |
Plot of land belongs to the State Enterprise "Vyhoda forestry." The authority to exclude a land for forestry purposes (with a change in intended use) within and outside the settlement of state-owned land refers the competence of the Cabinet of Ministers of Ukraine. Long-term temporary forest use of state and municipal property, realized without exclusion the land in regular forest users based on the decision of the authorities and local governments, adopted within their authority in consultation with regular forest users and executive authority on forestry provided Part 4 of Art. 18 Forest Code of Ukraine. However, temporary forest users have the right to erect temporary buildings and structures necessary for economic activities according to Art. 20 Forest Code of Ukraine, during a long-term use.Art. 20 Forest Codeof Ukraine, during a long-termuse. |
If it is necessary, what stage is the process of land plot allocation on |
According to ch. 2. Art. 149 The Land Code of Ukraine awithdrawal of land conducted with the consent of land users. In order to extract land in the first phase should be: - written consent to remove a land of the land user – the State Enterprise "Vyhoda forestry"; - informing the Cabinet of Ministers of Ukraine of intent appropriation of land with the reasons for the early design work; - permission of the Cabinet of Ministers on the manufacture project of land management on the allotment of the land, provided the appropriate order of the Cabinet of Ministers of Ukraine |
Possible project risks |
1. The financial and price instability, inflation. 2. Environmental degradation. 3. Lack of attention to the development of tourism of the State. 4. Poor state of transport infrastructure, low quality of services in а transportation. 5. Competition from other regions. 6. Changing needs and tastes of tourists-consumers. 7. Natural (floods, landslides, mudflows, erosion) and man-made emergencies. 8. Imperfect legal framework. 9. Deterioration of the investment climate. |
Other important information for investor about the project |
An important aspect of the project is its transport infrastructure and interchange. A road of а national importance "Dolyna - Hust",which connects IvanoFrankivsk and Transkarpathian region,goes through Torun pass |
Information about the legal entity –initiator of the project |
Full name, EDRPOU |
Investment Business Association "Carpathian Golden Ring" |
Location, address |
5, Prosp. Nezalezhnosti Dolyna, Ivano-Frankivs'ka obl. Ukraine 77500 |
Form of ownership |
Private |
Coreactivities |
- |
Website |
- |
Contacts |
Name, surname of the contact person |
Svetlana Osmolovsky
Natalia Dyndyn |
Position |
Chairman of Association
Chief Specialistof Investmentand Tourism Departmentof Tradeand Economic Development Dolyna District Administration |
Telephone:
- office phone
- mobile phone |
+380675052464
+38(03477)27063
+380997326585 |
Е-mail |
svetla_osm@mail.ru
doltour@ukr.net |
Fax |
+38(03477)27060 |
Language of communication |
Ukrainian |
Date of preparation |
08.2016 |
Information about investment project |
Full name of investment project |
Arrangement of the tourist infrastructure on Shyrkovets swamp, the reserve of national importance |
Prerequisites, that contribute to the project implementation |
Shyrkovets swamp is a natural hydrologic landmark with the national significance. It is situated in Dolyna District of Ivano-Frankivsk Region between Stariy Mizun and Noviy Mizun villages, within the territory of Vigoda Hollow at a height of 500-550m about the sea level. The protected area is 12ha. The swamp, which is registered by the international organization “Telma”, is well preserved as there was no draining on the surrounding territories. Bushy pines with umbrella-shaped crown create an interesting landscape that is unusual for the Carpathians. As there are no equals for Shyrkovets swamp in the Carpathians, this project is important and its implementation will provide an opportunity to protect the natural area and attract tourists. Also, it will perform an informational and educational function as well (flora and fauna research, nature- and environment- oriented activities, etc.) |
Expected results after project implementation |
Creation of new reasons to visit is the main factor in attracting tourists. “The Carpathian Tram” is a tourist route that is located alongside Shyrkovets swamp. It is one of the most visited tourist attractions in the district. |
UAH to USD exchange rate as at the date of information preparation |
24,8 |
Total cost of project
(thousand USD) |
102,0 |
Amount of investor's contribution (thousand USD) |
102,0 |
Required type of investor's contribution |
Cash contributions, thousand USD |
Contribution of the initiator of the project |
Plot of land (12 ha) |
Stage of the project |
Design estimate documentation is elaborated |
Manner (form) of investment attraction |
Long-term lease of land |
Describe the process of cooperation with investor (in particular, what payment guaranties can be provided to investor) |
The agreement with State Enterprise "Vyhoda forestry" for placement of small architectural forms |
Expected payback period of project |
15 years |
Is it necessary to apply to the body of local government for acquisition of rights on the land plot |
Plot of land belongs to the State Enterprise "Vyhoda forestry".
Long-term temporary forest use of state and municipal property, realized without exclusion the land in regular forest users based on the decision of the authorities and local governments, adopted within their authority in consultation with regular forest users and executive authority on forestry provided Part 4 of Art. 18 Forest Code of Ukraine. However, temporary forest users have the right to erect temporary buildings and structures necessary for economic activities according to Art. 20 Forest Code of Ukraine, during a long-term use.Art. 20 Forest Codeof Ukraine, during a long-termuse. |
If it is necessary, what stage is the process of land plot allocation on |
- |
Possible project risks |
1. The financial and price instability, inflation.
2. Environmental degradation.
3. Lack of attention to the development of tourism of the State.
4. Poor state of transport infrastructure, low quality of services in а transportation.
5. Competition from other regions.
6. Changing needs and tastes of tourists-consumers.
7. Natural (floods, landslides, mudflows, erosion) and man-made emergencies.
8. Imperfect legal framework.
9. Deterioration of the investment climate. |
Other important information for investor about the project |
The above-mentioned project has been included in the Development Strategy of Ivano-Frankivsk region within 2015-2017 years. The project foresees an installation of observation wooden platforms, garden houses, benches, information boards and models of wild animals |
Information about the legal entity -initiatorof the project |
Full name, EDRPOU |
District Administration of Dolyna |
Location, address |
5, Prosp. Nezalezhnosti Dolyna, Ivano-Frankivs'ka obl. Ukraine 77500 |
Form of ownership |
State ownership |
Coreactivities |
- |
Website |
http://ww2.gov.if.ua/dolynska |
Contacts |
Name, surname of the contact person |
Natalia Dyndyn |
Position |
Chief Specialistof Investmentand Tourism Departmentof Tradeand Economic Development Dolyna District Administration |
Telephone:
- office phone
- mobile phone |
+38(03477)27063
+380997326585 |
Е-mail |
doltour@ukr.net |
Fax |
+38(03477)27060 |
Language of communication |
Ukrainian |
Date of preparation |
August 2016 |
2.3. Land plots
General information |
1.1 |
Land plot type |
Green-field |
1.2 |
Land plot name |
Industrial park “Dolyna” |
1.3 |
Region |
Ivano-Frankivsk |
1.4 |
District |
Dolyna |
1.5 |
Name of the nearest settlement, distance (km)
|
Dolyna |
1.6 |
Distancetothenearestwellinghouse(km) |
0,6 |
1.6.1 |
Distancetotheborderofresidentialarea(km) |
0,6 |
1.7 |
Nameofthenearestdistrictcenter, distance (km) |
A plot of land is located within the town ofDolyna . It is outskirts of the town from the south-west side. There are no housing estates. |
1.8 |
Nameofthenearestregionalcenter, distance (km) |
Ivano-Frankivsk – 58,0 |
1.9 |
Landplotarea, ha |
27,14 |
1.10 |
Land plot shape |
irregularform(closetorectangular) |
1.11 |
Relief,elevationabovesealevel(m),
Differencesinlandlevel(m) |
Thereliefoftheareaiscleanandflat. The area is not waterlogged. |
1.12 |
Adjacent land plots |
Theplothasanareaof 5ha. It is owned by the "Inter-Hroklin" |
1.13 |
Buildings / otherconstructionson thelandplot, their owner |
No |
1.14 |
Undergroundobstacles |
No |
1.15 |
Groundandoverheadobstacles |
No |
1.16 |
Ecologicalrestrictions |
No |
1.17 |
Soilandundergroundwaterpollution |
No |
1.18 |
Riskofflooding |
No |
1.19 |
Additionalinformation |
-The landplotis locatedat a certaindistancefrom the housing estate,within the town.It is theareawithextremelyattractivemountainviews;
-There are all the basic utilities (gas, electricity, water delivery and sewerage );
-Thereliefoftheareaiscleanandflat;
-Theplotoflandhas a singleowner (theterritorialcommunity) andis freeofobligations;
-The land plot has never been used for industrial or military facilities needs. |
Legalstatus |
2.1 |
Owner |
Territorialcommunity the town of Dolyna(Dolyna Council) |
2.2 |
Formofownership |
Communal |
2.3 |
Titledocumentsoftheowner |
The Statecertificateontheownershipof a territorialcommunitythe town of Dolyna |
2.4 |
Cadastralnumber |
2622010100:01:013:0004 |
2.5 |
User |
Dolyna Town Council |
2.6 |
Titledocumentsoftheuser |
- |
2.7 |
Presentusage |
Freeplotoflandisassignedtothedevelopmentoftheindustrialparkandavailabletoattractnewinvestorsinterestedinallocatingoftheplotofland |
2.8 |
Thelandplotislocatedwithinoroutsideofthesettlemetlimits |
Theplot of landislocatedat a certaindistancefromthehousingestate, within the town |
2.9 |
Availabilityoftown planningdocumentation |
Theconceptoftheindustrialpark “Dolyna”, the general layout of the town |
2.10 |
Designated purpose of the land plot |
The plot of landforindustrialuse |
2.11 |
Legal restrictions (encumbrances) concerning the land plot |
No |
2.12 |
Conditions of land transfer |
Long-termlease |
2.13 |
Approximate price for the sale of land (UAH/sq.m) |
97 |
2.14 |
Approximate price for land lease (UAH/sq.m) |
2,91 |
2.15 |
Additionalinformation |
The transfer of plots to investors, who intends to build the industrial objects within the new industrial zone will be based on the auction for the right to purchase or long lease.
The Valueofnormativemoneyestimation is used to determine the base cost of land plot. |
Transport and engineering infrastructure |
3.1 |
Access roadtotheplot |
8,0m |
3.2 |
Distancetothemotorway of national
importance(km) |
0,1 |
3.3 |
Name of the railway station, distance by moving along the motorway (km) |
1,5 |
3.4 |
Name of the airport, distance by moving along the motorway (km) |
Internationalairport "Ivano-Frankivsk" |
3.5 |
Name of the nearest river, distance (km) |
4,0 |
3.6 |
Availabilityofpublictransportroutestothesite (buses, trains) |
Intertowntransportations Dolyna-Vygoda (by the area) |
|
Informationaboutgas supply |
|
3.7.1 |
· Distance to the existing gas pipeline (km) |
0,6 |
3.7.2 |
· Pipelinediameter(mm) |
High-pressuregaspipeline |
3.7.3 |
· Gas pressureinthepipeline(kgf/сm2) |
No information |
3.7.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
Noinformation |
3.7.5 |
· Distancetotheexistinggasdistributionstation, (km) |
0,6 |
3.7.6 |
· Capacitymarginofthegasdistributionstation (m3/h) |
2050 |
3.7.7 |
· Estimatedcostof the connection to the pipeline (thousand USD) |
Accordingto theestimate |
|
Informationaboutelectricity supply |
|
3.8.1 |
· Distance to the existing powertransmissionline(km) |
0,3 |
3.8.2 |
· Powertransmissionline voltage(kV) |
110/10 |
3.8.3 |
· Capacitymarginofthepossibleconnectiontothepowertransmissionline(kW) |
Noinformation |
3.8.4 |
· Distancetotheexistingtransformersubstation, (km) |
0,8 |
3.8.5 |
· Transformersubstation voltage (kV) |
Noinformation |
3.8.6 |
· Capacitymarginof thetransformersubstation(kW) |
10 000 |
3.8.7 |
· Estimatedcostof the electricity connection (thousand USD) |
Accordingto theestimate |
|
Informationabout water supply |
|
3.9.1 |
· Water supply of the plot |
Theestimatedwaterdemandfor IP isover 28 l / s. Itisapproximately 102.17 m3 / h. An existingwaterpipewith a diameterof 500 mm,whichislocated 900 metersfromthecenterof theequivalentarea is a potentialconnectionpointtothewatersystem. |
3.9.2 |
· Distancetotheexisting water pipeline (km) |
0,9 |
3.9.3 |
· Pipelinediameter(mm) |
500 |
3.9.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
102,17 |
3.9.5 |
· Estimatedcostof the water supply (thousand USD) |
Accordingtotheestimate |
|
Informationaboutsewagedischarge |
|
3.10.1 |
· Sewerage of the plot |
Town sewercollector |
3.10.2 |
· Distancetotheexisting sewerage system(km) |
0,45 |
3.10.3 |
· Sewerage systemdiameter (mm) |
400 |
3.10.4 |
· Capacitymarginofthepossibleconnectiontothe sewerage system (m3/h) |
No information |
3.10.5 |
· Does sewage flow to the existingtreatmentfacilities? |
Yes |
3.10.6 |
· Capacitymargin of the existingtreatmentfacilities (m3/h) |
Noinformation |
3.10.7 |
· Estimatedcostof the sewerage system (thousand USD |
Accordingtotheestimate |
|
Communicationnetworks |
|
3.11.1 |
· Fixedtelephony supply |
Distancetothestationarytelephonecommunicationnetwork |
3.11.2 |
· Stable covering of mobile telephony,mobile operators |
Yes |
3.12 |
Additionalinformation |
- Theplotoflandislocatedat a certaindistancefromthehousingestate, withinthetown. Itistheareawithextremelyattractivemountainviews;
- Thereareallthebasicutilities (gas, electricity, waterdeliveryandsewerage;
- Thereliefoftheareaiscleanandflat. Theareaisnotwaterlogged;
- Theplotoflandhas a singleowner (theterritorialcommunity the town of Dolyna) andisfreeofobligations;
- Theland plothasneverbeenusedforindustrialormilitaryfacilitiesneeds.;
- Convenienttransport сonnection (entranceroadandrailway), locationatthecrossroadsof themain waysbetweenLviv, Ivano-Frankivsk andTranscarpathianRegions;
-NotfarfromthebordersofthestatesoftheEuropeanunion;
-The moderateandattractivevalue of the normativemonetaryvaluationoflandforinvestors;
- The desire of local authorities to cooperate with investors. |
Contacts |
4.1 |
Establishment, organization |
Dolyna Council |
4.2 |
Website |
http://rada.dolyna.info |
4.3 |
Tel./Fax |
+38(03477)2 70 35, 2 70 07 |
4.4 |
Name,surnameofcontactperson |
VolodymyrSmolii, Natalia Holovata |
4.5 |
Position |
The assistant of the mayor, the specialist of the investment, energy conservation and municipal development department |
4.6 |
Language of communication |
Ukrainian, English |
4.7 |
Mobile phone |
+38 099 2206091 |
4.8 |
E-mail |
v.smolii@dolyna.info n.holovata@dolyna.info |
5 |
Dateofpreparation |
06/2016 |
General information |
1.1 |
Land plot type |
Green-field |
1.2 |
Land plot name |
Knyazholuka tract "Metalist" |
1.3 |
Region |
Ivano-Frankivsk |
1.4 |
District |
Dolinsky |
1.5 |
Name of the nearest settlement, distance (km)
|
Dolyna 0.8 |
1.6 |
Distancetothenearestdwellinghouse(km) |
0,4км |
1.6.1 |
Distancetotheborderofresidentialarea(km) |
0,3км |
1.7 |
Nameofthenearestdistrictcenter, distance (km) |
Dolyna 0.3 |
1.8 |
Nameofthenearestregionalcenter, distance (km) |
Ivano-Frankivsk 70 |
1.9 |
Landplotarea, ha |
2 |
1.10 |
Land plot shape |
trapeze |
1.11 |
Relief,elevationabovesealevel(m),
differencesinlandlevel(m) |
flat |
1.12 |
Adjacent land plots |
Knyazholuka Council |
1.13 |
Buildings / otherconstructionson thelandplot, their owner |
missing |
1.14 |
Undergroundobstacles |
Near is a high pressure gas pipeline |
1.15 |
Groundandoverheadobstacles |
Power lines 6 kV |
1.16 |
Ecologicalrestrictions |
|
1.17 |
Soilandundergroundwaterpollution |
Do not have |
1.18 |
Riskofflooding |
not lit |
1.19 |
Additionalinformation |
1.5 km mark. compressor station |
Legalstatus |
2.1 |
Owner |
State Ukraine |
2.2 |
Formofownership |
state |
2.3 |
Titledocumentsoftheowner |
missing |
2.4 |
Cadastralnumber |
Do not have |
2.5 |
User |
Earth Village Council |
2.6 |
Titledocumentsoftheuser |
missing |
2.7 |
Presentusage |
For industrial needs |
2.8 |
The landplotislocatedwithinoroutsideofthesettlemetlimits |
Outside the village the village Knyazholuka tract. "Metalist" |
2.9 |
Availabilityoftown planningdocumentation |
missing |
2.10 |
Designated purpose of the land plot |
|
2.11 |
Legal restrictions (encumbrances) concerning the land plot |
Security zone of high pressure gas pipeline |
2.12 |
Conditions of land transfer |
Sale
Long-termlease
Permanentuse
Other (specify) |
2.13 |
Approximate price for the sale of land (UAH/sq.m) |
5,72 |
2.14 |
Approximate price for land lease (UAH/sq.m) |
1,71 |
2.15 |
Additionalinformation |
|
Transport and engineering infrastructure |
3.1 |
Access roadtotheplot |
The existing field road 3.5 m |
3.2 |
Distancetothemotorway of national
importance(km) |
0.4 |
3.3 |
Name of the railway station, distance by moving along the motorway (km) |
Dolyna 5 |
3.4 |
Name of the airport, distance by moving along the motorway (km) |
Ivano-Frankivsk 70 |
3.5 |
Name of the nearest river, distance (km) |
River Sadzhavka 0.4 km |
3.6 |
Availabilityofpublictransportroutestothesite (buses, trains) |
Near highway passes Chernivtsi Stryi |
|
Informationaboutgas supply |
Near is 6 kV transmission line |
3.7.1 |
- Distance to the existing gas pipeline (km)
|
Near is medium pressure gas pipeline |
3.7.2 |
|
unknown |
3.7.3 |
- Gas pressureinthepipeline(kgf/сm2)
|
unknown |
3.7.4 |
- Capacitymarginofthepossibleconnectiontothepipeline (m3/h)
|
unknown |
3.7.5 |
- Distancetotheexistinggasdistributionstation, (km)
|
unknown |
3.7.6 |
- Capacitymarginofthegasdistributionstation (m3/h)
|
unknown |
3.7.7 |
- Estimatedcostof the connection to the pipeline (thousand USD)
|
According to estimates |
|
Informationaboutelectricity supply |
Near is 6 kV transmission line |
3.8.1 |
- Distance to the existing powertransmissionline(km)
|
0.2 |
3.8.2 |
- Powertransmissionline voltage(kV)
|
6 |
3.8.3 |
- Capacitymarginofthepossibleconnectiontothepowertransmissionline(kW)
|
unknown |
3.8.4 |
- Distancetotheexistingtransformersubstation, (km)
|
unknown |
3.8.5 |
- Transformersubstation voltage (kV)
|
unknown |
3.8.6 |
- Capacitymarginof thetransformersubstation(kW)
|
unknown |
3.8.7 |
- Estimatedcostof the electricity connection (thousand USD)
|
According to estimates |
|
Informationabout water supply |
Near is plumbing |
3.9.1 |
|
Connecting to the water supply |
3.9.2 |
- Distancetotheexisting water pipeline (km)
|
0.2 |
3.9.3 |
|
unknown |
3.9.4 |
- Capacitymarginofthepossibleconnectiontothepipeline (m3/h)
|
unknown |
3.9.5 |
- Estimatedcostof the water supply (thousand USD)
|
According to estimates |
|
Informationaboutsewagedischarge |
septic tanks |
3.10.1 |
|
Installation of septic tanks |
3.10.2 |
- Distancetotheexisting sewerage system(km)
|
Do not have |
3.10.3 |
- Sewerage systemdiameter (mm)
|
Do not have |
3.10.4 |
- Capacitymarginofthepossibleconnectiontothe sewerage system (m3/h)
|
Do not have |
3.10.5 |
- Does sewage flow to the existingtreatmentfacilities?
|
not submitted |
3.10.6 |
- Capacitymargin of the existingtreatmentfacilities (m3/h)
|
Do not have |
3.10.7 |
- Estimatedcostof the sewerage system (thousand USD
|
- |
|
Communicationnetworks |
Mobile Communication |
3.11.1 |
|
Connecting to a PBX Dolyna Knyazholuka |
3.11.2 |
- Stable covering of mobile telephony,mobile operators
|
available |
3.12 |
Additionalinformation |
|
Contacts |
4.1 |
Establishment, organization |
Knyazholutska Village Council |
4.2 |
Website |
|
4.3 |
Tel./Fax |
03477 55-4-00 |
4.4 |
Name,surnameofcontactperson |
Malon Victor |
4.5 |
Position |
village head |
4.6 |
Language of communication |
ukrainian |
4.7 |
Mobile phone |
0669290559 |
4.8 |
E-mail |
|
|
|
|
5 |
Dateofpreparation |
03.06.2016 |
General information |
1.1 |
Land plot type |
Green-field |
1.2 |
Land plot name |
Lolyn tract Bukovynka |
1.3 |
Region |
Ivano-Frankivsk |
1.4 |
District |
Dolinsky |
1.5 |
Name of the nearest settlement, distance (km) |
Lolyn 1.5 |
1.6 |
Distancetothenearestdwellinghouse(km) |
1.2 |
1.6.1 |
Distancetotheborderofresidentialarea(km) |
0.7 |
1.7 |
Nameofthenearestdistrictcenter, distance (km) |
Dolyna 18 |
1.8 |
Nameofthenearestregionalcenter, distance (km) |
Ivano-Frankivsk 84 |
1.9 |
Landplotarea, ha |
19 |
1.10 |
Land plot shape |
rectangular |
1.11 |
Relief,elevationabovesealevel(m),
differencesinlandlevel(m) |
inclined |
1.12 |
Adjacent land plots |
Earth citizens of the village and the land s / Board |
1.13 |
Buildings / otherconstructionson thelandplot, their owner |
missing |
1.14 |
Undergroundobstacles |
Do not have |
1.15 |
Groundandoverheadobstacles |
Do not have |
1.16 |
Ecologicalrestrictions |
- |
1.17 |
Soilandundergroundwaterpollution |
not dirty |
1.18 |
Riskofflooding |
not flooded |
1.19 |
Additionalinformation |
- |
Legalstatus |
2.1 |
Owner |
Lolynska Village Council |
2.2 |
Formofownership |
Communal |
2.3 |
Titledocumentsoftheowner |
Do not have |
2.4 |
Cadastralnumber |
missing |
2.5 |
User |
Do noy have |
2.6 |
Titledocumentsoftheuser |
missing |
2.7 |
Presentusage |
Pasture partially covered with shrubs |
2.8 |
The landplotislocatedwithinoroutsideofthesettlemetlimits |
As part of the settlement |
2.9 |
Availabilityoftown planningdocumentation |
missing |
2.10 |
Designated purpose of the land plot |
For recreation and tourism purposes |
2.11 |
Legal restrictions (encumbrances) concerning the land plot |
Do not have |
2.12 |
Conditions of land transfer |
Sale
Long-termlease
Permanentuse
Other (specify) |
2.13 |
Approximate price for the sale of land (UAH/sq.m) |
1,40 |
2.14 |
Approximate price for land lease (UAH/sq.m) |
0,47 |
2.15 |
Additionalinformation |
|
Transport and engineering infrastructure |
3.1 |
Access roadtotheplot |
dirt road 4m |
3.2 |
Distancetothemotorway of national
importance(km) |
6 |
3.3 |
Name of the railway station, distance by moving along the motorway (km) |
Dolyna 16 |
3.4 |
Name of the airport, distance by moving along the motorway (km) |
Ivano-Frankivsk 86 |
3.5 |
Name of the nearest river, distance (km) |
Do not have |
3.6 |
Availabilityofpublictransportroutestothesite (buses, trains) |
missing |
|
Informationaboutgas supply |
Do not have |
3.7.1 |
· Distance to the existing gas pipeline (km) |
Do not have |
3.7.2 |
· Pipelinediameter(mm) |
- |
3.7.3 |
· Gas pressureinthepipeline(kgf/сm2) |
- |
3.7.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
- |
3.7.5 |
· Distancetotheexistinggasdistributionstation, (km) |
- |
3.7.6 |
· Capacitymarginofthegasdistributionstation (m3/h) |
- |
3.7.7 |
· Estimatedcostof the connection to the pipeline (thousand USD) |
According to estimates |
|
Informationaboutelectricity supply |
Do not have |
3.8.1 |
· Distance to the existing powertransmissionline(km) |
- |
3.8.2 |
· Powertransmissionline voltage(kV) |
- |
3.8.3 |
· Capacitymarginofthepossibleconnectiontothepowertransmissionline(kW) |
- |
3.8.4 |
· Distancetotheexistingtransformersubstation, (km) |
- |
3.8.5 |
· Transformersubstation voltage (kV) |
- |
3.8.6 |
· Capacitymarginof thetransformersubstation(kW) |
- |
3.8.7 |
· Estimatedcostof the electricity connection (thousand USD) |
According to estimates |
|
Informationabout water supply |
missing |
3.9.1 |
· Water supply of the plot |
Blowing well |
3.9.2 |
· Distancetotheexisting water pipeline (km) |
- |
3.9.3 |
· Pipelinediameter(mm) |
- |
3.9.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
- |
3.9.5 |
· Estimatedcostof the water supply (thousand USD) |
According to estimates |
|
Informationaboutsewagedischarge |
- |
3.10.1 |
· Sewerage of the plot |
- |
3.10.2 |
· Distancetotheexisting sewerage system(km) |
- |
3.10.3 |
· Sewerage systemdiameter (mm) |
- |
3.10.4 |
· Capacitymarginofthepossibleconnectiontothe sewerage system (m3/h) |
- |
3.10.5 |
· Does sewage flow to the existingtreatmentfacilities? |
- |
3.10.6 |
· Capacitymargin of the existingtreatmentfacilities (m3/h) |
- |
3.10.7 |
· Estimatedcostof the sewerage system (thousand USD |
According to estimates |
|
Communicationnetworks |
missing |
3.11.1 |
· Fixedtelephony supply |
From PBX Lolyn |
3.11.2 |
· Stable covering of mobile telephony,mobile operators |
Kyivstar |
3.12 |
Additionalinformation |
|
Contacts |
4.1 |
Establishment, organization |
Lolynska Village Council |
4.2 |
Website |
|
4.3 |
Tel./Fax |
53-2-61 |
4.4 |
Name,surnameofcontactperson |
Yatsyshyn Roman |
4.5 |
Position |
village head |
4.6 |
Language of communication |
ukrainian |
4.7 |
Mobile phone |
|
4.8 |
E-mail |
|
|
|
|
5 |
Dateofpreparation |
01.06.2016 |
General information |
1.1 |
Land plot type |
Green-field |
1.2 |
Land plot name |
Lolyn tract Zolobky |
1.3 |
Region |
Ivano-Frankivsk |
1.4 |
District |
Dolinsky |
1.5 |
Name of the nearest settlement, distance (km)
|
Lolyn 1.5 |
1.6 |
Distancetothenearestdwellinghouse(km) |
1.2 |
1.6.1 |
Distancetotheborderofresidentialarea(km) |
0.7 |
1.7 |
Nameofthenearestdistrictcenter, distance (km) |
Dolyna 18 |
1.8 |
Nameofthenearestregionalcenter, distance (km) |
Ivano-Frankivsk 84 |
1.9 |
Landplotarea, ha |
23 |
1.10 |
Land plot shape |
rectangular |
1.11 |
Relief,elevationabovesealevel(m),
differencesinlandlevel(m) |
inclined |
1.12 |
Adjacent land plots |
Earth citizens of the village and the land s / Board |
1.13 |
Buildings / otherconstructionson thelandplot, their owner |
missing |
1.14 |
Undergroundobstacles |
Do not have |
1.15 |
Groundandoverheadobstacles |
Do not have |
1.16 |
Ecologicalrestrictions |
not dirty |
1.17 |
Soilandundergroundwaterpollution |
not lit |
1.18 |
Riskofflooding |
|
1.19 |
Additionalinformation |
|
Legalstatus |
2.1 |
Owner |
Lolynska Village Council |
2.2 |
Formofownership |
Communal |
2.3 |
Titledocumentsoftheowner |
Do not have |
2.4 |
Cadastralnumber |
missing |
2.5 |
User |
Do noy have |
2.6 |
Titledocumentsoftheuser |
missing |
2.7 |
Presentusage |
Pasture partially covered with shrubs |
2.8 |
The landplotislocatedwithinoroutsideofthesettlemetlimits |
As part of the settlement |
2.9 |
Availabilityoftown planningdocumentation |
missing |
2.10 |
Designated purpose of the land plot |
For recreation and tourism purposes |
2.11 |
Legal restrictions (encumbrances) concerning the land plot |
Do not have |
2.12 |
Conditions of land transfer |
Sale
Long-termlease
Permanentuse
Other (specify) |
2.13 |
Approximate price for the sale of land (UAH/sq.m) |
1,40 |
2.14 |
Approximate price for land lease (UAH/sq.m) |
0,047 |
2.15 |
Additionalinformation |
|
Transport and engineering infrastructure |
3.1 |
Access roadtotheplot |
dirt road 4m |
3.2 |
Distancetothemotorway of national
importance(km) |
6 |
3.3 |
Name of the railway station, distance by moving along the motorway (km) |
Dolyna 19 |
3.4 |
Name of the airport, distance by moving along the motorway (km) |
Ivano-Frankivsk 84 |
3.5 |
Name of the nearest river, distance (km) |
Do not have |
3.6 |
Availabilityofpublictransportroutestothesite (buses, trains) |
missing |
|
Informationaboutgas supply |
Do not have |
3.7.1 |
· Distance to the existing gas pipeline (km) |
Do not have |
3.7.2 |
· Pipelinediameter(mm) |
- |
3.7.3 |
· Gas pressureinthepipeline(kgf/сm2) |
- |
3.7.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
- |
3.7.5 |
· Distancetotheexistinggasdistributionstation, (km) |
- |
3.7.6 |
· Capacitymarginofthegasdistributionstation (m3/h) |
- |
3.7.7 |
· Estimatedcostof the connection to the pipeline (thousand USD) |
According to estimates |
|
Informationaboutelectricity supply |
Do not have |
3.8.1 |
· Distance to the existing powertransmissionline(km) |
- |
3.8.2 |
· Powertransmissionline voltage(kV) |
- |
3.8.3 |
· Capacitymarginofthepossibleconnectiontothepowertransmissionline(kW) |
- |
3.8.4 |
· Distancetotheexistingtransformersubstation, (km) |
- |
3.8.5 |
· Transformersubstation voltage (kV) |
- |
3.8.6 |
· Capacitymarginof thetransformersubstation(kW) |
- |
3.8.7 |
· Estimatedcostof the electricity connection (thousand USD) |
According to estimates |
|
Informationabout water supply |
missing |
3.9.1 |
· Water supply of the plot |
Blowing well |
3.9.2 |
· Distancetotheexisting water pipeline (km) |
- |
3.9.3 |
· Pipelinediameter(mm) |
- |
3.9.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
- |
3.9.5 |
· Estimatedcostof the water supply (thousand USD) |
According to estimates |
|
Informationaboutsewagedischarge |
- |
3.10.1 |
· Sewerage of the plot |
- |
3.10.2 |
· Distancetotheexisting sewerage system(km) |
- |
3.10.3 |
· Sewerage systemdiameter (mm) |
- |
3.10.4 |
· Capacitymarginofthepossibleconnectiontothe sewerage system (m3/h) |
- |
3.10.5 |
· Does sewage flow to the existingtreatmentfacilities? |
- |
3.10.6 |
· Capacitymargin of the existingtreatmentfacilities (m3/h) |
- |
3.10.7 |
· Estimatedcostof the sewerage system (thousand USD |
According to estimates |
|
Communicationnetworks |
missing |
3.11.1 |
· Fixedtelephony supply |
From PBX Lolyn |
3.11.2 |
· Stable covering of mobile telephony,mobile operators |
Kyivstar |
3.12 |
Additionalinformation |
|
Contacts |
4.1 |
Establishment, organization |
Lolynska Village Council |
4.2 |
Website |
|
4.3 |
Tel./Fax |
53-2-61 |
4.4 |
Name,surnameofcontactperson |
Yatsyshyn Roman |
4.5 |
Position |
village head |
4.6 |
Language of communication |
ukrainian |
4.7 |
Mobile phone |
|
4.8 |
E-mail |
|
|
|
|
5 |
Dateofpreparation |
01.06.2016 |
General information |
1.1 |
Land plot type |
Green-field |
1.2 |
Land plot name |
Kalnya |
1.3 |
Region |
Ivano-Frankivsk |
1.4 |
District |
Dolinsky |
1.5 |
Name of the nearest settlement, distance (km)
|
Kalnya 0.8 |
1.6 |
Distancetothenearestdwellinghouse(km) |
0.7 |
1.6.1 |
Distancetotheborderofresidentialarea(km) |
0.6 |
1.7 |
Nameofthenearestdistrictcenter, distance (km) |
Dolyna 18 |
1.8 |
Nameofthenearestregionalcenter, distance (km) |
Ivano – Frankivsk 83 |
1.9 |
Landplotarea, ha |
12 |
1.10 |
Land plot shape |
rectangular |
1.11 |
Relief,elevationabovesealevel(m),
differencesinlandlevel(m) |
inclined |
1.12 |
Adjacent land plots |
Earth citizens of the village and the land s / Board |
1.13 |
Buildings / otherconstructionson thelandplot, their owner |
missing |
1.14 |
Undergroundobstacles |
Do not have |
1.15 |
Groundandoverheadobstacles |
Do not have |
1.16 |
Ecologicalrestrictions |
|
1.17 |
Soilandundergroundwaterpollution |
not dirty |
1.18 |
Riskofflooding |
not lit |
1.19 |
Additionalinformation |
|
Legalstatus |
2.1 |
Owner |
Kalnyanska Village Council |
2.2 |
Formofownership |
Communal |
2.3 |
Titledocumentsoftheowner |
do not have |
2.4 |
Cadastralnumber |
missing |
2.5 |
User |
do not have |
2.6 |
Titledocumentsoftheuser |
missing |
2.7 |
Presentusage |
Grasslands partially overgrown bushes |
2.8 |
The landplotislocatedwithinoroutsideofthesettlemetlimits |
As part of the settlement |
2.9 |
Availabilityoftown planningdocumentation |
missing |
2.10 |
Designated purpose of the land plot |
For recreation and tourism purposes |
2.11 |
Legal restrictions (encumbrances) concerning the land plot |
do not have |
2.12 |
Conditions of land transfer |
Sale
Long-termlease
Permanentuse
Other (specify) |
2.13 |
Approximate price for the sale of land (UAH/sq.m) |
1.50 |
2.14 |
Approximate price for land lease (UAH/sq.m) |
0.54 |
2.15 |
Additionalinformation |
|
Transport and engineering infrastructure |
3.1 |
Access roadtotheplot |
dirt road 4 m |
3.2 |
Distancetothemotorway of national
importance(km) |
12 |
3.3 |
Name of the railway station, distance by moving along the motorway (km) |
Dolyna 20 |
3.4 |
Name of the airport, distance by moving along the motorway (km) |
Ivano-Frankivsk 85 |
3.5 |
Name of the nearest river, distance (km) |
Do not have |
3.6 |
Availabilityofpublictransportroutestothesite (buses, trains) |
bus |
|
Informationaboutgas supply |
Do not have |
3.7.1 |
· Distance to the existing gas pipeline (km) |
Do noy have |
3.7.2 |
· Pipelinediameter(mm) |
- |
3.7.3 |
· Gas pressureinthepipeline(kgf/сm2) |
- |
3.7.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
- |
3.7.5 |
· Distancetotheexistinggasdistributionstation, (km) |
- |
3.7.6 |
· Capacitymarginofthegasdistributionstation (m3/h) |
- |
3.7.7 |
· Estimatedcostof the connection to the pipeline (thousand USD) |
According to estimates |
|
Informationaboutelectricity supply |
Do not have |
3.8.1 |
· Distance to the existing powertransmissionline(km) |
- |
3.8.2 |
· Powertransmissionline voltage(kV) |
- |
3.8.3 |
· Capacitymarginofthepossibleconnectiontothepowertransmissionline(kW) |
- |
3.8.4 |
· Distancetotheexistingtransformersubstation, (km) |
- |
3.8.5 |
· Transformersubstation voltage (kV) |
- |
3.8.6 |
· Capacitymarginof thetransformersubstation(kW) |
- |
3.8.7 |
· Estimatedcostof the electricity connection (thousand USD) |
According to estimates |
|
Informationabout water supply |
missing |
3.9.1 |
· Water supply of the plot |
blowing well |
3.9.2 |
· Distancetotheexisting water pipeline (km) |
- |
3.9.3 |
· Pipelinediameter(mm) |
- |
3.9.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
- |
3.9.5 |
· Estimatedcostof the water supply (thousand USD) |
According to estimates |
|
Informationaboutsewagedischarge |
- |
3.10.1 |
· Sewerage of the plot |
- |
3.10.2 |
· Distancetotheexisting sewerage system(km) |
- |
3.10.3 |
· Sewerage systemdiameter (mm) |
- |
3.10.4 |
· Capacitymarginofthepossibleconnectiontothe sewerage system (m3/h) |
- |
3.10.5 |
· Does sewage flow to the existingtreatmentfacilities? |
- |
3.10.6 |
· Capacitymargin of the existingtreatmentfacilities (m3/h) |
- |
3.10.7 |
· Estimatedcostof the sewerage system (thousand USD |
According to estimates |
|
Communicationnetworks |
missing |
3.11.1 |
· Fixedtelephony supply |
from the PBX. Kalnya |
3.11.2 |
· Stable covering of mobile telephony,mobile operators |
Kyivstar |
3.12 |
Additionalinformation |
|
Contacts |
4.1 |
Establishment, organization |
Kalnyanska Village Council |
4.2 |
Website |
|
4.3 |
Tel./Fax |
33-3-36 |
4.4 |
Name,surnameofcontactperson |
Ravlyuk Victor |
4.5 |
Position |
village head |
4.6 |
Language of communication |
Ukrainian |
4.7 |
Mobile phone |
|
4.8 |
E-mail |
|
|
|
|
5 |
Dateofpreparation |
01.06.2016 |
General information |
1.1 |
Land plot type |
Green-field
Brown-field |
1.2 |
Land plot name |
Novyi Mizun tour. "Rovenky" |
1.3 |
Region |
Ivano-Frankivsk |
1.4 |
District |
Dolinsky |
1.5 |
Name of the nearest settlement, distance (km)
|
Novyi Mizun 1.5 km |
1.6 |
Distancetothenearestdwellinghouse(km) |
1,2 км |
1.6.1 |
Distancetotheborderofresidentialarea(km) |
0,7 км |
1.7 |
Nameofthenearestdistrictcenter, distance (km) |
Dolyna 15 |
1.8 |
Nameofthenearestregionalcenter, distance (km) |
Ivano-Frankivsk distance 15 |
1.9 |
Landplotarea, ha |
2.5 |
1.10 |
Land plot shape |
rectangular |
1.11 |
Relief,elevationabovesealevel(m),
differencesinlandlevel(m) |
inclined |
1.12 |
Adjacent land plots |
Earth citizens of the village and the land s / Board |
1.13 |
Buildings / otherconstructionson thelandplot, their owner |
missing |
1.14 |
Undergroundobstacles |
do not have |
1.15 |
Groundandoverheadobstacles |
do not have |
1.16 |
Ecologicalrestrictions |
|
1.17 |
Soilandundergroundwaterpollution |
not dirty |
1.18 |
Riskofflooding |
not lit |
1.19 |
Additionalinformation |
|
Legalstatus |
2.1 |
Owner |
village council |
2.2 |
Formofownership |
communal |
2.3 |
Titledocumentsoftheowner |
do not have |
2.4 |
Cadastralnumber |
missing |
2.5 |
User |
do not have |
2.6 |
Titledocumentsoftheuser |
meadows partly overgrown with bushes |
2.7 |
Presentusage |
within the village |
2.8 |
The landplotislocatedwithinoroutsideofthesettlemetlimits |
missing |
2.9 |
Availabilityoftown planningdocumentation |
For recreational purposes |
2.10 |
Designated purpose of the land plot |
|
2.11 |
Legal restrictions (encumbrances) concerning the land plot |
Do not have |
2.12 |
Conditions of land transfer |
Sale
Long-termlease
Permanentuse
Other (specify) |
2.13 |
Approximate price for the sale of land (UAH/sq.m) |
4,2 |
2.14 |
Approximate price for land lease (UAH/sq.m) |
0,125 |
2.15 |
Additionalinformation |
|
Transport and engineering infrastructure |
3.1 |
Access roadtotheplot |
dirt road 4m |
3.2 |
Distancetothemotorway of national
importance(km) |
6 |
3.3 |
Name of the railway station, distance by moving along the motorway (km) |
Dolyna 15 |
3.4 |
Name of the airport, distance by moving along the motorway (km) |
Ivano-Frankivsk 80 |
3.5 |
Name of the nearest river, distance (km) |
Mizunka 0.9 |
3.6 |
Availabilityofpublictransportroutestothesite (buses, trains) |
Bus service |
|
Informationaboutgas supply |
Near is 10kV transmission line |
3.7.1 |
· Distance to the existing gas pipeline (km) |
Do not have |
3.7.2 |
· Pipelinediameter(mm) |
- |
3.7.3 |
· Gas pressureinthepipeline(kgf/сm2) |
- |
3.7.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
- |
3.7.5 |
· Distancetotheexistinggasdistributionstation, (km) |
- |
3.7.6 |
· Capacitymarginofthegasdistributionstation (m3/h) |
- |
3.7.7 |
· Estimatedcostof the connection to the pipeline (thousand USD) |
According to estimates |
|
Informationaboutelectricity supply |
Do not have |
3.8.1 |
· Distance to the existing powertransmissionline(km) |
About 0.4 |
3.8.2 |
· Powertransmissionline voltage(kV) |
10 |
3.8.3 |
· Capacitymarginofthepossibleconnectiontothepowertransmissionline(kW) |
- |
3.8.4 |
· Distancetotheexistingtransformersubstation, (km) |
- |
3.8.5 |
· Transformersubstation voltage (kV) |
- |
3.8.6 |
· Capacitymarginof thetransformersubstation(kW) |
- |
3.8.7 |
· Estimatedcostof the electricity connection (thousand USD) |
According to estimates |
|
Informationabout water supply |
- |
3.9.1 |
· Water supply of the plot |
blowing well |
3.9.2 |
· Distancetotheexisting water pipeline (km) |
- |
3.9.3 |
· Pipelinediameter(mm) |
- |
3.9.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
- |
3.9.5 |
· Estimatedcostof the water supply (thousand USD) |
According to estimates |
|
Informationaboutsewagedischarge |
|
3.10.1 |
· Sewerage of the plot |
- |
3.10.2 |
· Distancetotheexisting sewerage system(km) |
- |
3.10.3 |
· Sewerage systemdiameter (mm) |
- |
3.10.4 |
· Capacitymarginofthepossibleconnectiontothe sewerage system (m3/h) |
- |
3.10.5 |
· Does sewage flow to the existingtreatmentfacilities? |
- |
3.10.6 |
· Capacitymargin of the existingtreatmentfacilities (m3/h) |
- |
3.10.7 |
· Estimatedcostof the sewerage system (thousand USD |
According to estimates |
|
Communicationnetworks |
cellphone |
3.11.1 |
· Fixedtelephony supply |
from the PBX with. Old Mizun |
3.11.2 |
· Stable covering of mobile telephony,mobile operators |
Kyivstar |
3.12 |
Additionalinformation |
|
Contacts |
4.1 |
Establishment, organization |
village council |
4.2 |
Website |
|
4.3 |
Tel./Fax |
03477 61-1-12 |
4.4 |
Name,surnameofcontactperson |
Saschyn Ruslan |
4.5 |
Position |
village head |
4.6 |
Language of communication |
Ukrainian |
4.7 |
Mobile phone |
|
4.8 |
E-mail |
|
|
|
|
5 |
Dateofpreparation |
01.06.16 |
General information |
1.1 |
Land plot type |
Green-field |
1.2 |
Land plot name |
v.Roztochky truck "Bovkuty" |
1.3 |
Region |
Ivano-Frankivsk |
1.4 |
District |
Dolinskiy |
1.5 |
Name of the nearest settlement, distance (km)
|
v.Roztochky 1.2 |
1.6 |
Distancetothenearestdwellinghouse(km) |
1.2 |
1.6.1 |
Distancetotheborderofresidentialarea(km) |
0.8 |
1.7 |
Nameofthenearestdistrictcenter, distance (km) |
Dolyna 14 |
1.8 |
Nameofthenearestregionalcenter, distance (km) |
Ivano-Frankivsk 79 |
1.9 |
Landplotarea, ha |
3.2 |
1.10 |
Land plot shape |
rectangular |
1.11 |
Relief,elevationabovesealevel(m),
differencesinlandlevel(m) |
inclined |
1.12 |
Adjacent land plots |
Earth Citizens villages and lands of the village council |
1.13 |
Buildings / otherconstructionson thelandplot, their owner |
missing |
1.14 |
Undergroundobstacles |
Do not have |
1.15 |
Groundandoverheadobstacles |
Do not have |
1.16 |
Ecologicalrestrictions |
not dirty |
1.17 |
Soilandundergroundwaterpollution |
When floods partially flooding |
1.18 |
Riskofflooding |
|
1.19 |
Additionalinformation |
|
Legalstatus |
2.1 |
Owner |
Roztochky |
2.2 |
Formofownership |
Communal |
2.3 |
Titledocumentsoftheowner |
Do not have |
2.4 |
Cadastralnumber |
missing |
2.5 |
User |
Do not have |
2.6 |
Titledocumentsoftheuser |
missing |
2.7 |
Presentusage |
pasture partly overgrown bushes |
2.8 |
The landplotislocatedwithinoroutsideofthesettlemetlimits |
Outside the village |
2.9 |
Availabilityoftown planningdocumentation |
missing |
2.10 |
Designated purpose of the land plot |
For recreational purposes |
2.11 |
Legal restrictions (encumbrances) concerning the land plot |
Do not have |
2.12 |
Conditions of land transfer |
Sale
Long-termlease
Permanentuse
Other (specify) |
2.13 |
Approximate price for the sale of land (UAH/sq.m) |
4,2 |
2.14 |
Approximate price for land lease (UAH/sq.m) |
0,125 |
2.15 |
Additionalinformation |
|
Transport and engineering infrastructure |
3.1 |
Access roadtotheplot |
dirt road 4 m |
3.2 |
Distancetothemotorway of national
importance(km) |
14 |
3.3 |
Name of the railway station, distance by moving along the motorway (km) |
Dolyna 25 |
3.4 |
Name of the airport, distance by moving along the motorway (km) |
Ivano-Frankivsk 95 |
3.5 |
Name of the nearest river, distance (km) |
Luzhanka 0.2 |
3.6 |
Availabilityofpublictransportroutestothesite (buses, trains) |
Bus service |
|
Informationaboutgas supply |
Connection to the 10 kV transmission line |
3.7.1 |
· Distance to the existing gas pipeline (km) |
Do not have |
3.7.2 |
· Pipelinediameter(mm) |
- |
3.7.3 |
· Gas pressureinthepipeline(kgf/сm2) |
- |
3.7.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
- |
3.7.5 |
· Distancetotheexistinggasdistributionstation, (km) |
- |
3.7.6 |
· Capacitymarginofthegasdistributionstation (m3/h) |
- |
3.7.7 |
· Estimatedcostof the connection to the pipeline (thousand USD) |
According to estimates |
|
Informationaboutelectricity supply |
Connection to the 10 kV transmission line |
3.8.1 |
· Distance to the existing powertransmissionline(km) |
Around 2.2 |
3.8.2 |
· Powertransmissionline voltage(kV) |
10 |
3.8.3 |
· Capacitymarginofthepossibleconnectiontothepowertransmissionline(kW) |
- |
3.8.4 |
· Distancetotheexistingtransformersubstation, (km) |
- |
3.8.5 |
· Transformersubstation voltage (kV) |
- |
3.8.6 |
· Capacitymarginof thetransformersubstation(kW) |
- |
3.8.7 |
· Estimatedcostof the electricity connection (thousand USD) |
According to estimates |
|
Informationabout water supply |
- |
3.9.1 |
· Water supply of the plot |
blowing well |
3.9.2 |
· Distancetotheexisting water pipeline (km) |
- |
3.9.3 |
· Pipelinediameter(mm) |
- |
3.9.4 |
· Capacitymarginofthepossibleconnectiontothepipeline (m3/h) |
- |
3.9.5 |
· Estimatedcostof the water supply (thousand USD) |
According to estimates |
|
Informationaboutsewagedischarge |
- |
3.10.1 |
· Sewerage of the plot |
- |
3.10.2 |
· Distancetotheexisting sewerage system(km) |
- |
3.10.3 |
· Sewerage systemdiameter (mm) |
- |
3.10.4 |
· Capacitymarginofthepossibleconnectiontothe sewerage system (m3/h) |
- |
3.10.5 |
· Does sewage flow to the existingtreatmentfacilities? |
- |
3.10.6 |
· Capacitymargin of the existingtreatmentfacilities (m3/h) |
- |
| | |