General information |
1.1 |
Land plot type |
Green-field
|
1.2 |
Land plot name |
236a Mazepy Street |
1.3 |
Region |
Ivano-Frankivsk |
1.4 |
District |
Kolomyia |
1.5 |
Name of the nearest settlement, distance (km)
|
within the limits of Kolomyia |
1.6 |
Distance to the nearest dwelling house (km) |
0,005 km |
1.6.1 |
Distance to the border of residential area (km) |
0,068 km |
1.7 |
Name of the nearest district center, distance(km) |
within the limits of Kolomyia |
1.8 |
Name of the nearest regional center, distance(km) |
Ivano-Frankivsk, 68 km |
1.9 |
Land plot area, ha |
0,0046 ha |
1.10 |
Land plot shape |
area of rectangular form |
1.11 |
Relief, elevation above sea level (m),
differences in land level (m) |
A plain,
A mark above a sea level is 300 m and the
difference between the greatest and lowest marks is 0,5 m |
1.12 |
Adjacent land plots |
peculiar |
1.13 |
Buildings / other constructions on the land plot, their owner |
Buildings and other constructions are absent |
1.14 |
Underground obstacles |
KL-0,4 kW |
1.15 |
Ground and overhead obstacles |
absent |
1.16 |
Ecological restrictions |
absent |
1.17 |
Soil and underground water pollution |
absent |
1.18 |
Risk of flooding |
absent |
1.19 |
Additional information |
|
Legal status |
2.1 |
Owner |
Kolomyia City Council |
2.2 |
Form of ownership |
communal |
2.3 |
Title documents of the owner |
Drew out from a state register of material rights on the real estate |
2.4 |
Cadastral number |
2610600000:27:002:0025 |
2.5 |
User |
Kolomyia City Council |
2.6 |
Title documents of the user |
Drew out from a state register of material rights on the real estate |
2.7 |
Present usage |
For building and maintenance of housings buildings, economic buildings and buildings |
2.8 |
The land plot is located within or outside of the settlemet limits |
Within of the settlement limits |
2.9 |
Availability of town planning documentation |
Chart of zoning of Kolomyia
from 09.03.2015
General layout from 04.16.2004 |
2.10 |
Designated purpose of the land plot |
02.01 |
2.11 |
Legal restrictions (encumbrances) concerning the land plot |
Servitut on a right for passage by an area |
2.12 |
Conditions of land transfer |
Sale
|
2.13 |
Approximate price for the sale of land (UAH/sq.m) |
170,58 UAH/m.kv |
2.14 |
Approximate price for land lease (UAH/sq.m) |
3% -12% from normatively-money estimation |
2.15 |
Additional information |
|
Transport and engineering infrastructure |
3.1 |
Access road to the plot |
Asphaltic coverage
Width 12 m |
3.2 |
Distance to the motorway of national
importance (km) |
5 km |
3.3 |
Name of the railway station, distance by moving along the motorway (km) |
Kolomya agile-carriage DEPO
1,5 km |
3.4 |
Name of the airport, distance by moving along the motorway (km) |
Ivano-Frankivsk international airport
56,4 km |
3.5 |
Name of the nearest river, distance (km) |
The River Prut
3,706 |
3.6 |
Availability of public transport routes to the site (buses, trains) |
Busses №3; 65; 8; 19 |
|
Information about gas supply |
|
3.7.1 |
· Distance to the existing gas pipeline (km) |
0,24; 0,17 km |
3.7.2 |
· Pipeline diameter (mm) |
159 mm |
3.7.3 |
· Gas pressure in the pipeline (kgf/сm2) |
0,03; 1,0 kgp/sm2 |
3.7.4 |
· Capacity margin of the possible connection to the pipeline (m3/h) |
200; 1000 m3/hour |
3.7.5 |
· Distance to the existing gas distribution station, (km) |
0,7 km |
3.7.6 |
· Capacity margin of the gas distribution station (m3/h) |
2000 m3/hour |
3.7.7 |
· Estimated cost of the connection to the pipeline (thousand USD) |
45000,00; 35 000,00 USD |
|
Information about electricity supply |
|
3.8.1 |
· Distance to the existing power transmission line (km) |
absent |
3.8.2 |
· Power transmission linevoltage (kW) |
absent |
3.8.3 |
· Capacity margin of the possible connection to the power transmission line (kW) |
absent |
3.8.4 |
· Distance to the existing transformer substation, (km) |
0,2 km |
3.8.5 |
· Transformer substation voltage (kV) |
0,4 kW |
3.8.6 |
· Capacity margin of the transformer substation (kW) |
25 kVt |
3.8.7 |
· Estimated cost of the electricity connection (thousand USD) |
4029,00-20145,00 USD
reference cost of tricking into electric system |
|
Information about water supply |
|
3.9.1 |
· Water supply of the plot |
Connecting to the network of water-supply of Kolomyia |
3.9.2 |
· Distance to the existing water pipeline (km) |
50 m |
3.9.3 |
· Pipeline diameter (mm) |
100 mm |
3.9.4 |
· Capacity margin of the possible connection to the pipeline (m3/h) |
25 m3/hour |
3.9.5 |
· Estimated cost of the water supply (thousand USD) |
1 mp 28,20 – 40,29 USD
depending on the depth of well |
|
Information about sewage discharge |
|
3.10.1 |
· Sewerage of the plot |
network connecting to the overflow-pipe |
3.10.2 |
· Distance to the existing sewerage system (km) |
passes through territory of the area |
3.10.3 |
· Sewerage system diameter (mm) |
500 mm |
3.10.4 |
· Capacity margin of the possible connection to the sewerage system(m3/h) |
250 m3/hour |
3.10.5 |
· Does sewage flow to the existing treatment facilities? |
Yes, the sewage flow is existing treatment facilities |
3.10.6 |
· Capacity margin of the existing treatment facilities (m3/h) |
15000 m3/h |
3.10.7 |
· Estimated cost of the sewerage system (thousand USD |
1 mp 28,20 – 40,29 USD
depending on the depth of well |
|
Communication networks |
|
3.11.1 |
· Fixed telephony supply |
connecting to the network |
3.11.2 |
· Stable covering of mobile telephony, mobile operators |
Kyivstar, MTS, Ukraine Vodafon , lifecell, Ukrtelecom. |